[1]
Mali, S.A.R., Yanuar, A. and Sumarna, D.L. 2025. ANALISIS WAKTU BAKU PADA PROSES KERJA DIVISI INCOMING DI MPC BANDUNG DENGAN MENGGUNAKAN METODE TIME STUDY. Jurnal Bisnis, Logistik dan Supply Chain (BLOGCHAIN). 4, 2 (Jan. 2025), 75–82. DOI:https://doi.org/10.55122/blogchain.v4i2.1418.