Mali, S., Yanuar, A., & Sumarna, D. (2025). ANALISIS WAKTU BAKU PADA PROSES KERJA DIVISI INCOMING DI MPC BANDUNG DENGAN MENGGUNAKAN METODE TIME STUDY. Jurnal Bisnis, Logistik Dan Supply Chain (BLOGCHAIN), 4(2), 75-82. https://doi.org/10.55122/blogchain.v4i2.1418