Mali, Sisilia, Amri Yanuar, and Dani Sumarna. 2025. “ANALISIS WAKTU BAKU PADA PROSES KERJA DIVISI INCOMING DI MPC BANDUNG DENGAN MENGGUNAKAN METODE TIME STUDY”. Jurnal Bisnis, Logistik Dan Supply Chain (BLOGCHAIN) 4 (2), 75-82. https://doi.org/10.55122/blogchain.v4i2.1418.