Mali, S., A. Yanuar, and D. Sumarna. “ANALISIS WAKTU BAKU PADA PROSES KERJA DIVISI INCOMING DI MPC BANDUNG DENGAN MENGGUNAKAN METODE TIME STUDY”. Jurnal Bisnis, Logistik Dan Supply Chain (BLOGCHAIN), Vol. 4, no. 2, Jan. 2025, pp. 75-82, doi:10.55122/blogchain.v4i2.1418.